VILLA 1
  • New Guest Kitchen

  • Upgrade Existing Main-Kitchen

  • Upgrade Bar and Coffee Corner, new Cabinets

  • Upgrade Walkways, new Sandwash on Stairs

  • Upgrade Massage, Shower and Reading Salas

  • Upgrade Pool Sala

  • Paint Fassade of Reception and Dorm Building

  • Paint-spray all sliding doors

  • Paint all bedroom walls and dorms

  • Replace or upgrade furniture in bedrooms incl. wardrobes

  • Upgrade bathrooms

  • New bunkbeds in the upper dormitory

  • New carpet in all rooms/areas 

  • ...and much more

VILLA 2
  • New Beach Kitchen

  • Upgrade Living, Dining and Kitchen Salas

  • Change wooden stairs from upper pool to lower pool to concrete/tiles

  • Upgrade Massage Sala

  • Upgrade dormitory, new floor, new ceiling, new carpet

  • Upgrade storage room

  • Paint-spray all sliding doors

  • Paint all bedrooms walls and dorms

  • Replace or upgrade furniture in bedrooms incl. wardrobes

  • Upgrade bathrooms

  • New carpet in all rooms/areas 

  • ...and much more

VILLA 3
  • New Main and Back Kitchen

  • Upgrade Living and Dining Salas, new wall cabinets

  • Upgrade all shutters around lower pond

  • Upgrade Pool Sala

  • Upgrade Massage Sala

  • Upgrade Welcome Sala and entrance area

  • Paint outdoor walls

  • Paint-spray all sliding doors

  • Paint all bedrooms, dorms

  • Replace or upgrade furniture in bedrooms incl. wardrobes

  • Upgrade bathrooms

  • New carpet in all rooms/areas 

  • ...and much more

RENOVATION AND UPGRADE WORKS AND SANGSURI JUNE/JULY 2024

On the 11th of June 2024, one day after the departure of a large group of Undergraduate students from Tokyo who had spent 10 days at Sangsuri, our 8-week renovation work at Sangsuri started.

​

Approximately 50 staff members from 6 different contractor companies will be working for a duration of 8 weeks at Sangsuri to improve many areas of our three Villas.

​

Our own staff - most of them are working for Sangsuri full-time since many years - will also take over some of the smaller tasks such as deep cleaning of the Terrazzo floor, simple paint jobs and much more.

​

In total there are more than 60 different projects with an investment level approaching U$ 400.000 to be completed over the next 8 weeks. Some of these projects for each villa are listed in the tables below.

​

We are confident that all the projects can be completed on time. In case of bad weather conditions, we would have to postpone some of these projects to a later date to ensure that the villas will be ready for the arrival of our next guests early August.

Screenshot 2024-06-12 at 16.08.15.png
Screenshot 2024-06-12 at 16.08.03.png
Screenshot 2024-06-12 at 16.07.56.png
Screenshot 2024-06-12 at 16.08.54.png
Screenshot 2024-06-12 at 16.07.46.png
Screenshot 2024-06-12 at 16.07.36.png
Screenshot 2024-06-12 at 16.07.27.png
Screenshot 2024-06-12 at 16.07.20.png
Screenshot 2024-06-12 at 16.09.57.png
Screenshot 2024-06-12 at 16.09.24.png
Screenshot 2024-06-12 at 16.10.31.png
Screenshot 2024-06-12 at 16.10.19.png