VILLA 1
-
New Guest Kitchen
-
Upgrade Existing Main-Kitchen
-
Upgrade Bar and Coffee Corner, new Cabinets
-
Upgrade Walkways, new Sandwash on Stairs
-
Upgrade Massage, Shower and Reading Salas
-
Upgrade Pool Sala
-
Paint Fassade of Reception and Dorm Building
-
Paint-spray all sliding doors
-
Paint all bedroom walls and dorms
-
Replace or upgrade furniture in bedrooms incl. wardrobes
-
Upgrade bathrooms
-
New bunkbeds in the upper dormitory
-
New carpet in all rooms/areas
-
...and much more
VILLA 2
-
New Beach Kitchen
-
Upgrade Living, Dining and Kitchen Salas
-
Change wooden stairs from upper pool to lower pool to concrete/tiles
-
Upgrade Massage Sala
-
Upgrade dormitory, new floor, new ceiling, new carpet
-
Upgrade storage room
-
Paint-spray all sliding doors
-
Paint all bedrooms walls and dorms
-
Replace or upgrade furniture in bedrooms incl. wardrobes
-
Upgrade bathrooms
-
New carpet in all rooms/areas
-
...and much more
VILLA 3
-
New Main and Back Kitchen
-
Upgrade Living and Dining Salas, new wall cabinets
-
Upgrade all shutters around lower pond
-
Upgrade Pool Sala
-
Upgrade Massage Sala
-
Upgrade Welcome Sala and entrance area
-
Paint outdoor walls
-
Paint-spray all sliding doors
-
Paint all bedrooms, dorms
-
Replace or upgrade furniture in bedrooms incl. wardrobes
-
Upgrade bathrooms
-
New carpet in all rooms/areas
-
...and much more
RENOVATION AND UPGRADE WORKS AND SANGSURI JUNE/JULY 2024
On the 11th of June 2024, one day after the departure of a large group of Undergraduate students from Tokyo who had spent 10 days at Sangsuri, our 8-week renovation work at Sangsuri started.
​
Approximately 50 staff members from 6 different contractor companies will be working for a duration of 8 weeks at Sangsuri to improve many areas of our three Villas.
​
Our own staff - most of them are working for Sangsuri full-time since many years - will also take over some of the smaller tasks such as deep cleaning of the Terrazzo floor, simple paint jobs and much more.
​
In total there are more than 60 different projects with an investment level approaching U$ 400.000 to be completed over the next 8 weeks. Some of these projects for each villa are listed in the tables below.
​
We are confident that all the projects can be completed on time. In case of bad weather conditions, we would have to postpone some of these projects to a later date to ensure that the villas will be ready for the arrival of our next guests early August.